Public Meeting #1 Materials

Access and download materials below from the April 29th, 2025 public meeting.

PM#1 Presentation

DIVIDER

September 2025 Virtual Open House

View materials below that were shared as part of the September 2025 virtual-only project open house.

DIVIDER

Public Meeting #2

Other Outer Loop Projects and Studies

Collin County

  • Collin County Outer Loop (Collin County, In Progress) - The 55-mile planned multi-modal transportation facility that will ultimately go from the Denton/Collin County line to the Rockwall/Collin County line. The facility will include a freeway with a wide area in the center reserved as a future transit corridor.

Kaufman County

  • Kaufman County Outer Loop Study (Kaufman County, In Progress) - Kaufman County is currently studying the 9-mile portion of the proposed Outer Loop in Kaufman County.

Denton County

Rockwall County